Manufacturing for established and multinational brands
Large production runs made to a held specification, with the documentation a brand's procurement and compliance teams ask for.

15
standard on every order
29
arranged on request
45
to be confirmed
Capacity and minimums
The same figures we publish across this site, for your forecast.

20,000
pieces a month. Sterling silver and vermeil, across all running programmes.
1 piece
Bespoke fine and bridal jewelry
Made to order, one piece at a time
5 pieces
Solid gold, per design
9K to 18K, across sizes
20 pieces
925 silver and vermeil, per design
Across sizes and plating colours
200 units
Custom-branded packaging
Unbranded stock packaging in any quantity
Minimums are per design. The schedule for a volume run is stated in your quotation.
What brand procurement teams check
Grouped as a supplier questionnaire groups them, each with where we stand.
Responsible sourcing and traceability
9 requirementsWhere the metal and stones come from, and whether that can be shown on paper.
Natural and lab-grown diamonds named and kept separate
That natural and laboratory-grown diamonds are described exactly and never mixed in a parcel or a piece.
Why it matters
Mixing or misdescribing them is a serious consumer-protection failure for the brand that sells the piece.
Evidence
Stone type stated on the specification, quotation and invoice.
Standard on every orderGemstones and packaging from vetted suppliers, under one contact
Who supplies the stones and packaging, and who is answerable for them.
Why it matters
Procurement teams want one accountable supplier rather than several unmanaged ones.
Evidence
Supplier for stones and packaging stated at quotation.
Standard on every orderResponsible sourcing policy
A written policy for sourcing metals and stones, built on the five-step framework of the OECD Due Diligence Guidance for minerals from conflict-affected and high-risk areas.
Why it matters
It is the common reference point for regulators and for the brand's own due diligence.
Evidence
Signed policy document and a record of how it is applied.
To be confirmedGold and silver from accredited refiners
Whether precious metal is bought from refiners on the LBMA Good Delivery List, which must meet LBMA's Responsible Gold Guidance, or from RJC Chain of Custody certified sources.
Why it matters
A named, audited refiner is the most direct evidence that metal is responsibly sourced.
Evidence
Metal purchase invoices naming the refiner, and the refiner's accreditation.
To be confirmedRecycled metal declared
Whether recycled gold or silver is used, and how that is documented from refiner to finished piece.
Why it matters
Brands that make recycled-content claims must be able to substantiate them.
Evidence
Refiner declaration of recycled content per lot.
To be confirmedDiamonds under the Kimberley Process and the System of Warranties
That rough diamonds entered the trade under the Kimberley Process Certification Scheme and that invoices carry the World Diamond Council System of Warranties statement.
Why it matters
Buyers of diamond jewelry are expected to pass the warranty along their own invoices.
Evidence
Supplier invoices carrying the System of Warranties statement.
To be confirmedConflict minerals information for regulated buyers
Origin information on gold for buyers covered by the EU Conflict Minerals Regulation (EU) 2017/821 or by US Dodd-Frank Section 1502 reporting.
Why it matters
These buyers must carry out and report due diligence on gold in their supply chain.
Evidence
Completed origin declaration for gold, supported by refiner documents.
To be confirmedLot-level traceability
Records that link each production lot to the metal and stone purchases used in it.
Why it matters
Without it, a sourcing problem cannot be traced to the pieces affected.
Evidence
Production lot records with material inputs.
To be confirmedGrading reports passed through with the stones
That independent grading reports, such as GIA or IGI reports, travel with the stones they describe.
Why it matters
The report is often what the brand's customer is paying for.
Evidence
Original reports matched to stones by report number.
Arranged on request
Certifications, memberships and audits
6 requirementsThird-party schemes that let a procurement team rely on someone else's audit.
Responsible Jewellery Council membership and Code of Practices certification
Membership of the RJC and certification against the RJC Code of Practices, which is mandatory for its commercial members and verified by independent third-party audit.
Why it matters
For many brands it is the baseline evidence of responsible business practice in the jewelry supply chain.
Evidence
RJC certificate and its scope, checkable on the RJC's member listing.
To be confirmedRJC Chain of Custody certification
Certification against the RJC Chain of Custody standard, a voluntary standard for handling and trading responsibly sourced precious metal.
Why it matters
It is what allows a brand to make a chain-of-custody claim about its metal.
Evidence
RJC Chain of Custody certificate.
To be confirmedISO 9001 quality management certification
A quality management system certified to ISO 9001 by an accredited certification body.
Why it matters
It shows that quality is managed as a system, not only checked at the end.
Evidence
ISO 9001 certificate and its scope.
To be confirmedThai registrations and trade memberships
Company, tax and export registrations, and memberships of national trade bodies such as The Gem and Jewelry Institute of Thailand's programmes.
Why it matters
They confirm the supplier is a registered business that can lawfully invoice and export.
Evidence
Registration certificates, listed in the trust section of this site.
To be confirmedCurrent certificates sent with the supplier questionnaire
Copies of whatever certificates and registrations are held, supplied with the brand's supplier questionnaire.
Why it matters
Procurement teams file evidence, not claims.
Evidence
Certificate copies with issue and expiry dates.
Arranged on requestBuyer or third-party audit visits
Access for the brand's own auditors, or an audit firm it appoints, to visit the workshop.
Why it matters
Many brands audit a new supplier before the first production order.
Evidence
Agreed audit date and access, with the report shared with the brand.
Arranged on request
Environmental management
6 requirementsPlating, pickling and polishing produce waste that has to be handled properly.
ISO 14001 environmental management certification
An environmental management system certified to ISO 14001.
Why it matters
It gives brands a recognised basis for their own supply-chain environmental reporting.
Evidence
ISO 14001 certificate and its scope.
To be confirmedWastewater from plating and cleaning treated
How rinse water and spent solutions from plating, pickling and ultrasonic cleaning are treated or disposed of.
Why it matters
Untreated discharge is a legal and reputational risk that brands check for directly.
Evidence
Treatment system description, discharge permits, licensed waste contractor records.
To be confirmedChemicals stored, labelled and inventoried
A chemical inventory with safety data sheets, correct storage and trained handlers.
Why it matters
Plating and refining chemicals are hazardous to people and the environment.
Evidence
Chemical register and safety data sheets.
To be confirmedPrecious metal recovered from waste
Whether filings, polishing dust and sweeps are collected and refined.
Why it matters
It reduces waste and is part of metal accountability.
Evidence
Refining returns for recovered material.
To be confirmedEnergy, water and emissions data
Figures for energy and water use that the brand can include in its own reporting.
Why it matters
Brands increasingly report supply-chain emissions and need data from suppliers.
Evidence
Utility records summarised per period.
To be confirmedRecycled or certified packaging materials
Packaging made from recycled or certified paper and board, where the brand specifies it.
Why it matters
Packaging is the most visible part of a brand's environmental claim.
Evidence
Material specification from the packaging supplier.
Arranged on request
Quality management and testing
10 requirementsHow the piece the brand approved becomes thousands of pieces that match it.
Technical review before sampling
Whether the design can be made as drawn, and what would need to change, before any sample is paid for.
Why it matters
Problems found at drawing stage cost nothing to fix.
Evidence
Written technical review.
Standard on every orderWritten specification and quotation
Metal, karat, stones, finish, quantity and terms stated in writing.
Why it matters
Every later check is made against this document.
Evidence
Signed specification and quotation.
Standard on every orderSample approved before production
That production starts only after the brand signs off the quotation and the sample.
Why it matters
The approved sample is the brand's control over what it receives.
Evidence
Signed sample approval.
Standard on every orderProduction inspected against the approved sample
That finished pieces are checked against the reference the brand approved before they ship.
Why it matters
It is the difference between a sample that is right and an order that is right.
Evidence
Inspection record per batch.
Standard on every orderAgreed sampling plan and inspection records
A defined sampling plan and acceptance level for each batch, with records kept.
Why it matters
Brands want to know how many pieces were checked and what was found.
Evidence
Inspection procedure and batch records.
To be confirmedMetal fineness checked in-house
Equipment to check the fineness of metal and finished pieces during production.
Why it matters
Under-karat metal is a legal problem for the brand in most markets.
Evidence
Equipment description and check records.
To be confirmedPlating thickness measured
Measurement of plating thickness on plated and vermeil pieces.
Why it matters
Thickness decides how long a finish lasts and whether a piece can be called vermeil.
Evidence
Measurement records per batch.
To be confirmedThird-party laboratory testing of a batch
Samples from a batch sent to an independent laboratory, for example The Gem and Jewelry Institute of Thailand for precious metal content.
Why it matters
Independent results carry more weight with the brand's compliance team.
Evidence
Laboratory report naming the batch.
Arranged on requestThird-party inspection before shipment
Inspection of the finished goods by an inspection agency the brand chooses.
Why it matters
Many brands release payment only after their own inspection.
Evidence
Inspection agency report.
Arranged on requestNon-conformances and corrective action
A documented way of recording defects, finding the cause and preventing repeats.
Why it matters
Brands judge suppliers by how they respond to a problem, not only by whether one occurs.
Evidence
Corrective action reports.
To be confirmed
Product safety and regulatory compliance by market
9 requirementsEach market sets its own rules for what jewelry may contain and how it is described.
Vermeil named only when it qualifies
That pieces are called vermeil only when they meet the standard of the market where they are sold, and are otherwise described as gold-plated silver.
Why it matters
Some markets define vermeil, for example the US FTC Jewelry Guides, and misdescription is the brand's liability.
Evidence
Plating karat and thickness stated on the quotation.
Standard on every orderNickel release in the EU
That pieces in prolonged skin contact meet the nickel restriction in REACH Annex XVII, entry 27.
Why it matters
Nickel is a common cause of skin allergy, and the restriction applies to everything sold in the EU.
Evidence
Test report from an independent laboratory.
Arranged on requestLead in jewelry in the EU
That jewelry meets the lead restriction in REACH Annex XVII, entry 63.
Why it matters
The restriction sets limits for lead in jewelry articles sold in the EU.
Evidence
Test report from an independent laboratory.
Arranged on requestCadmium in jewelry in the EU
That metal parts of jewelry meet the cadmium restriction in REACH Annex XVII, entry 23.
Why it matters
Cadmium in jewelry is restricted in the EU.
Evidence
Test report from an independent laboratory.
Arranged on requestChildren's jewelry in the US
Third-party testing for total lead content under the US Consumer Product Safety Improvement Act, so the brand can issue its Children's Product Certificate.
Why it matters
Children's jewelry is regulated as a children's product in the US.
Evidence
Third-party test report supporting the brand's certificate.
Arranged on requestCalifornia Proposition 65
Testing that tells the brand whether a product sold in California needs a warning for a listed chemical such as lead or cadmium.
Why it matters
Businesses must decide whether a warning is required, and jewelry has been the subject of enforcement.
Evidence
Test report the brand uses for its own assessment.
Arranged on requestQuality marks and UK hallmarking
Fineness marks stamped to the destination market's rules, and for the UK, pieces sent to a UK Assay Office for hallmarking under the Hallmarking Act 1973.
Why it matters
Selling precious metal without the required marks is an offence in some markets.
Evidence
Marking agreed on the specification; Assay Office records for the UK.
Arranged on requestThe brand's restricted substances list
Testing against the brand's own list of restricted substances where it goes beyond the law.
Why it matters
Many brands set limits stricter than the legal minimum.
Evidence
Test report against the brand's list.
Arranged on requestDiamond, gemstone and metal descriptions follow CIBJO nomenclature
That stones, treatments and metals are described using the terms in the CIBJO Blue Books.
Why it matters
Consistent, accepted terms keep product descriptions defensible across markets.
Evidence
Description conventions applied to specifications and invoices.
To be confirmed
Intellectual property and confidentiality
6 requirementsA brand's designs are its business. It needs to know they will not appear anywhere else.
NDA before files are shared
A confidentiality agreement signed before any drawing, CAD file or sample is sent.
Why it matters
It protects unreleased designs from the first contact.
Evidence
Signed NDA.
Standard on every orderDesigns remain the client's and are used for its orders only
That files and designs the brand sends are never reused, adapted or sold to anyone else.
Why it matters
Copies of a design undermine the brand's range and pricing.
Evidence
Ownership terms in the quotation and NDA.
Standard on every orderMold and tooling ownership
Who owns the molds, master models and logo tooling made for the brand, and what happens to them when the programme ends.
Why it matters
Tooling is the means to copy a design, so its control matters as much as the files.
Evidence
Tooling ownership terms in the supply agreement.
Arranged on requestRejects and overruns destroyed or returned
That pieces outside the order, rejected pieces and overruns are destroyed or returned by agreement.
Why it matters
Branded surplus leaking into the market damages pricing and reputation.
Evidence
Destruction or return record.
Arranged on requestDesign exclusivity
Exclusivity on designs developed for the brand, for an agreed period or market.
Why it matters
Brands investing in development want the result to stay theirs.
Evidence
Exclusivity clause in the supply agreement.
Arranged on requestRestricted access to files and samples
Controls on who can open the brand's files and handle its pre-launch samples.
Why it matters
Leaks most often come from inside the supplier.
Evidence
Access controls described in writing.
To be confirmed
Security of materials, continuity and risk
7 requirementsGold and stones are high-value goods, and a programme depends on the supplier staying open.
Secure storage of metal and stones
Safes or a strong room for metal, stones and finished goods outside working hours.
Why it matters
The brand's stones and finished stock are often in the supplier's custody.
Evidence
Description of storage, confirmed at audit.
To be confirmedAccess control and CCTV
Controlled entry to production areas and camera coverage of where valuables are handled.
Why it matters
It deters and detects loss.
Evidence
Security description, confirmed at audit.
To be confirmedMetal accountability
Weighing metal in and out of each stage and reconciling the loss.
Why it matters
It is how a workshop shows that the metal a brand pays for ends up in its pieces.
Evidence
Weigh-in and weigh-out records.
To be confirmedInsurance of goods in custody and transit
Cover for the brand's materials and finished goods while in the workshop and in transit.
Why it matters
A loss without cover becomes the brand's loss.
Evidence
Insurance certificate.
To be confirmedProduct liability insurance
Liability cover for products supplied.
Why it matters
Many supply agreements require it.
Evidence
Insurance certificate.
To be confirmedAnti-bribery and anti-money-laundering policy
Written policies against bribery and money laundering, which precious-metal businesses are expected to have.
Why it matters
Brands are liable for corruption in their supply chain in several jurisdictions.
Evidence
Signed policies.
To be confirmedBusiness continuity plan
A plan for power loss, flooding, illness of key staff and supplier failure.
Why it matters
A long programme needs a supplier that can keep delivering.
Evidence
Written continuity plan.
To be confirmed
Capacity, planning and delivery
8 requirementsWhether the supplier can make the volume, on time, season after season.
Published minimums
Minimums start at 1 piece for bespoke fine jewelry, 5 pieces per design in solid gold and 20 pieces per design in 925 silver or vermeil.
Why it matters
Brands need to know whether a test run or a full programme fits.
Evidence
Minimums stated on this site and on the quotation.
Standard on every orderCapacity stated in writing
For volume programmes we produce up to 20,000 pieces a month in silver and vermeil.
Why it matters
Procurement teams compare stated capacity against their forecast before awarding volume.
Evidence
Up to 20,000 pieces a month, with the schedule for each run stated in the quotation.
Standard on every orderSchedule stated in the quotation
The schedule for a run, from sample approval to dispatch, set out in writing.
Why it matters
Launch dates depend on it.
Evidence
Schedule in the quotation.
Standard on every orderRestocks made to the held specification
That the approved specification stays on file and every restock is made and inspected against it.
Why it matters
A reorder that does not match the first order breaks a range.
Evidence
Approved specification on file.
Standard on every orderProduction status reports
Regular updates on each order's progress during a run.
Why it matters
Brands plan logistics and marketing around production.
Evidence
Status reports at agreed intervals.
Arranged on requestCapacity reserved for peak seasons
Production capacity booked ahead of the brand's peak selling periods.
Why it matters
Peak-season stock-outs are the costliest kind.
Evidence
Reservation agreed in writing.
Arranged on requestCall-offs against a blanket order
Deliveries scheduled in instalments against one agreed order.
Why it matters
It spreads stock and cash flow for the brand.
Evidence
Blanket order terms.
Arranged on requestOn-time delivery record
A measured record of orders delivered on the agreed date.
Why it matters
Brands score suppliers on it.
Evidence
Delivery performance records.
To be confirmed
Technical and design capability
6 requirementsWhether the workshop can make what the brand's designers draw, at the quality they expect.
CAD and 3D-printed models in-house
CAD modelling and printed resin models produced in the workshop.
Why it matters
It shortens development and keeps files under the supplier's control.
Evidence
Equipment and software described, confirmed at audit.
To be confirmedProcesses available in-house
Which of casting, bench work, setting, enamel, plating and finishing are carried out in the workshop.
Why it matters
It tells the brand how much of the order the supplier controls directly.
Evidence
Process list, confirmed at audit.
To be confirmedStone setting under magnification
Setters working at microscopes for pavé, micro-pavé and small stones.
Why it matters
Setting quality decides how many stones stay in.
Evidence
Setting capability shown on samples and at audit.
To be confirmedDurability checks on findings and settings
Checks on clasps, hinges, posts and stone security before a design goes into production.
Why it matters
Returns for broken clasps and lost stones cost the brand more than the piece.
Evidence
Check method and records.
To be confirmedDesign development from a brief
New designs developed from a mood board or brief, as well as made to the brand's own drawings.
Why it matters
Some brands want a manufacturing partner that can also develop range.
Evidence
Development quoted separately.
Arranged on requestOne design across metals and finishes
The same design offered in silver, vermeil, plated silver or gold.
Why it matters
Brands build price tiers from one design.
Evidence
Options listed on the quotation.
Arranged on request
Commercial, financial and account management
6 requirementsWhether the supplier is a stable business that is easy to work with.
Registered legal entity
A registered company whose details the brand can check with the registrar.
Why it matters
Brands can only contract with, and pay, a verifiable entity.
Evidence
Company registration certificate.
To be confirmedFinancial standing
Financial statements or bank references showing the business can carry a large order.
Why it matters
A supplier that runs out of cash mid-programme strands the brand's stock.
Evidence
Financial statements or bank reference.
To be confirmedCosting that separates metal, labour and stones
A price build-up that shows metal, labour, stones and finishing separately.
Why it matters
It lets the brand track metal price changes and compare quotes fairly.
Evidence
Itemised quotation.
Arranged on requestSupplier questionnaire and onboarding documents
The brand's supplier questionnaire completed and its onboarding documents returned.
Why it matters
No supplier can be set up without them.
Evidence
Completed questionnaire.
Arranged on requestDedicated project contact
One named person responsible for the brand's account.
Why it matters
Large programmes fail on communication more often than on making.
Evidence
Named contact in the supply agreement.
Arranged on requestEnglish-language account management
Staff who can handle specifications, approvals and problems in English.
Why it matters
Misunderstood specifications are expensive.
Evidence
Named staff and their roles.
To be confirmed
Packaging, labelling and logistics
7 requirementsGoods have to arrive packed, labelled and documented the way the brand's warehouse expects.
Shipping terms agreed in the quotation
Destination, shipping terms and who arranges freight stated in writing.
Why it matters
Unclear terms cause delays and disputes at customs.
Evidence
Shipping terms in the quotation.
Standard on every orderBranded packaging and inserts
Boxes, pouches, cards and inserts made to the brand's specification by our vetted packaging suppliers.
Why it matters
Packaging is part of the product for a brand.
Evidence
Packaging specification and approved sample.
Arranged on requestLabels, barcodes and routing requirements
SKU labels, barcodes, hang tags and carton marks to the brand's or retailer's routing guide.
Why it matters
Warehouses reject or charge for goods that arrive labelled wrongly.
Evidence
Labelling applied to the brand's guide.
Arranged on requestCountry of origin marked
Origin shown on goods and documents as the destination market requires.
Why it matters
Incorrect origin marking can hold goods at customs.
Evidence
Origin marking agreed on the specification.
Arranged on requestMaterial test reports with the shipment
Test reports for the batch supplied with the shipping documents.
Why it matters
The brand's compliance team files them against each delivery.
Evidence
Reports listed on the packing list.
Arranged on requestExport documentation and customs clearance
Commercial invoice, packing list and export clearance under the company's own name.
Why it matters
Goods cannot leave Thailand cleanly without them.
Evidence
Exporter registration and sample documents.
To be confirmedPacking that protects the finish
Individual bagging, anti-tarnish protection and cartons that survive transit.
Why it matters
Tarnished or scratched stock is unsellable on arrival.
Evidence
Packing specification.
To be confirmed
One contact, from metal to packaging
Five stages, one team to talk to. Each stage shows who does the work.
Metals
Silver and gold for your pieces, cast and worked in our workshop.
Sourced and worked by JewelsRova
Gemstones
Stones bought to your specification from suppliers we have vetted.
Sourced from our vetted suppliers
Jewelry manufacturing
Casting, bench work, setting and finishing, made to your approved sample.
Made by JewelsRova
Packaging
Boxes, pouches and cards from our packaging suppliers, quoted with your order.
Sourced from our vetted suppliers
Quality check and dispatch
Every batch inspected against the approved sample, then packed and sent.
Checked by JewelsRova
We manufacture the jewelry ourselves. Gemstones and packaging come from vetted suppliers we manage, and you deal with one team for all of it.
We do not make packaging, and we do not cut or mine gemstones.
How every order is protected
- NDA before you share filesA confidentiality agreement can be signed before you send a single drawing.
- Technical review firstYou hear whether the design can be made as drawn before you pay for a sample.
- Everything in writingMetal, karat, stones, finish, quantity and terms, stated on the quotation.
- Nothing made without approvalProduction starts only after you sign off the quotation and the sample.
- Stones and metals named exactlyNatural and lab-grown never mixed. Vermeil only when it qualifies.
- Checked against your sampleFinished pieces are inspected against the reference you approved.
- Your designs stay yoursFiles and designs you send are used for your orders only.
- Told who makes whatYou are told which stages are in-house and which, if any, are with a partner.
How onboarding works for a brand account
Six steps from first contact to repeat orders.

- 01
NDA
A confidentiality agreement is signed before you send drawings, CAD files or samples.
- 02
Supplier questionnaire and documents
We complete your questionnaire and send our current certificates and registrations with it.
- 03
Sample or pilot order
Samples, or a short pilot run, made to the written specification for your sign-off.
Your approval - 04
Audit or inspection, if required
Your auditors, or an agency you appoint, visit or inspect before volume is placed.
- 05
Production programme
Volume made to the approved sample, with each batch inspected against it before dispatch.
- 06
Reorders
The approved specification stays on file, so every reorder is made and checked to match.
Questions
Which certifications do you hold?
We send you our current certificates and registrations with the supplier questionnaire; ask for the ones your programme requires. Where your programme needs a certificate or audit we do not hold, we tell you so plainly rather than offer a substitute.
Can our auditors or an audit firm visit?
Yes. A visit by your own team or by an audit firm you appoint can be arranged before the first production order, at a date agreed with you.
Will you sign an NDA and agree exclusivity?
An NDA is signed before you share any files, and your designs are used for your orders only. Exclusivity on designs developed for you, and ownership of molds and tooling, can be agreed in the supply agreement.
Do you use subcontractors?
You are told at quotation which stages are carried out in-house and which, if any, by a partner. Gemstones and packaging come from our vetted suppliers, and you deal with one team for all of it.
Can you supply test reports and compliance documents?
Independent laboratory testing of a batch, for example for nickel, lead or cadmium, and inspection by an agency you choose can be arranged at your request and cost. Reports can travel with the shipment documents.
What capacity and lead times can you offer?
For volume programmes we produce up to 20,000 pieces a month in silver and vermeil. The schedule for each run, from sample approval to dispatch, is stated in your quotation.
Send us your programme or supplier questionnaire.
Tell us the categories, volumes and markets. You get a technical review and a written quotation before anything is made.
- Technical review before you pay for a sample
- Written quotation against a defined specification
- Your designs stay confidential
Sources
The bodies, schemes and regulations named on this page. They are named for reference only; naming one does not mean we are a member, are certified or are endorsed by it.
- Responsible Jewellery Council, Code of Practices standard
- Responsible Jewellery Council, Chain of Custody standard
- LBMA, Responsible Sourcing and Responsible Gold Guidance
- OECD, Due Diligence Guidance for Responsible Supply Chains of Minerals
- Kimberley Process Certification Scheme
- World Diamond Council, System of Warranties
- EU Conflict Minerals Regulation (EU) 2017/821
- US SEC, conflict minerals rule under Dodd-Frank Section 1502
- ISO 9001 quality management
- ISO 14001 environmental management
- ISO 45001 occupational health and safety
- Sedex, SMETA
- amfori BSCI
- Social Accountability International, SA8000
- ECHA, substances restricted under REACH (Annex XVII)
- US CPSC, total lead content in children's products
- California Proposition 65 warnings (OEHHA)
- US FTC Guides for the Jewelry, Precious Metals, and Pewter Industries (16 CFR Part 23)
- UK hallmarking guidance notes
- UK Hallmarking Act 1973
- CIBJO, the Blue Books
- GIA (Gemological Institute of America)
- IGI (International Gemological Institute)
- The Gem and Jewelry Institute of Thailand (GIT)
Brand names are never used on this site: we do not name clients, jewelry houses, fashion groups or retailers. See also wholesale and bulk production.
Social compliance and labour
9 requirementsHow people are employed and treated, which brands are accountable for in their supply chain.
Told which stages are in-house and which are with a partner
Where each stage of the order is carried out, and by whom.
Why it matters
Unauthorised subcontracting is one of the most common social-compliance failures brands find.
Evidence
In-house and partner stages stated at quotation.
SMETA audit report
A Sedex Members Ethical Trade Audit (SMETA), an audit methodology covering labour standards and health and safety, with environment and business ethics in its four-pillar form.
Why it matters
One report can be shared with every brand on the Sedex platform, so it is widely requested.
Evidence
SMETA report and corrective action plan, shared on Sedex.
amfori BSCI audit
An audit against the amfori BSCI Code of Conduct, which is built on ILO standards and is run by independent audit firms.
Why it matters
It is the social audit many European retailers and brands ask their suppliers for.
Evidence
amfori BSCI audit report and rating.
SA8000 certification
Certification to SA8000, the certifiable social standard from Social Accountability International.
Why it matters
Some brands treat it as the strongest form of social-compliance evidence.
Evidence
SA8000 certificate.
The buyer's supplier code of conduct signed
Acceptance of the brand's own code of conduct as a condition of supply.
Why it matters
Most brands require it before a supplier can be set up.
Evidence
Signed code of conduct.
No child labour or forced labour
Age-verification records, freely chosen employment and no retention of workers' identity documents.
Why it matters
These are zero-tolerance issues for every brand.
Evidence
Personnel records and policy, checked at audit.
Wages, hours and contracts under Thai law
Written contracts, legal wages, recorded working hours and paid overtime.
Why it matters
Wage and hours findings are among the most frequent audit failures.
Evidence
Payroll and time records, checked at audit.
Health and safety at the bench, casting and plating
Ventilation, protective equipment, chemical handling, fire safety and first aid in a workshop that uses heat, acids and plating solutions.
Why it matters
Jewelry workshops carry real hazards, and brands are judged by how their suppliers manage them.
Evidence
Risk assessments, training records, fire certificates.
A grievance channel for workers
A confidential way for workers to raise concerns without retaliation.
Why it matters
Audit schemes and brand codes expect one.
Evidence
Written procedure and record of cases.